The problem at the GPO was a leak in a rain leader that was located in a structural column that ran 140 feet from the roof to the lower levels of the building. The last time the GPO experienced a leak in a rain leader, the fix involved four weeks of labor, a jackhammer and final restoration of the finishes.
Please wait while flipbook is loading. For more related info, FAQs and issues please refer to DearFlip WordPress Flipbook Plugin Help documentation.