U.S. Government Printing Office

The problem at the GPO was a leak in a rain leader that was located in a structural column that ran 140 feet from the roof to the lower levels of the building. The last time the GPO experienced a leak in a rain leader, the fix involved four weeks of labor, a jackhammer and final restoration of the finishes.

Please wait while flipbook is loading. For more related info, FAQs and issues please refer to DearFlip WordPress Flipbook Plugin Help documentation.

Share:

Facebook
Twitter
Pinterest
LinkedIn

Leave a Reply

On Key

Related Posts

Marriott Mountainside Resort

Getting ready for the 2002 Winter Olympics, The Marriott’s Mountain Side Resort at Park City Utah had taken on a high profile prominence.

The Corcoran Gallery of Art

The Corcoran Gallery of Art / Corcoran College of Art and Design, is the largest privately supported art institution in Washington, D.C. Founded in 1867

Lombardi Comprehensive Cancer Center

The Lombardi Comprehensive Cancer Center at Georgetown University Hospital in Washington DC is a National Cancer Institute-designated Comprehensive Care Center. Its primary objective is to