The problem at the GPO was a leak in a rain leader that was located in a structural column that ran 140 feet from the roof to the lower levels of the building. The last time the GPO experienced a leak in a rain leader, the fix involved four weeks of labor, a jackhammer and final restoration of the finishes.
ePIPE Project Reaches 10 year Milestone – One California Plaza
Early in the life of this world class facility, the property engineers found evidence of water leak in the copper pipe supply lines servicing the building. In