British Petroleum chooses ePIPE to protect production platform

ACE DuraFlo, TDT Plumbing recently completed pipe restoration work on the British Petroleum Gas & Oil production platform in the Gulf of Mexico. ACE used its patented ePIPE system to restore the potable water system on the platform with pipes ranging in size from 1/2″ to 3″ in diameter. Pipes are stainless steel and had developed pinhole leaks in just a few years into operation.

Please wait while flipbook is loading. For more related info, FAQs and issues please refer to DearFlip WordPress Flipbook Plugin Help documentation.

Share:

Facebook
Twitter
Pinterest
LinkedIn

Leave a Reply

On Key

Related Posts

Marriott Mountainside Resort

Getting ready for the 2002 Winter Olympics, The Marriott’s Mountain Side Resort at Park City Utah had taken on a high profile prominence.

The Corcoran Gallery of Art

The Corcoran Gallery of Art / Corcoran College of Art and Design, is the largest privately supported art institution in Washington, D.C. Founded in 1867

Lombardi Comprehensive Cancer Center

The Lombardi Comprehensive Cancer Center at Georgetown University Hospital in Washington DC is a National Cancer Institute-designated Comprehensive Care Center. Its primary objective is to