ACE DuraFlo, TDT Plumbing recently completed pipe restoration work on the British Petroleum Gas & Oil production platform in the Gulf of Mexico. ACE used its patented ePIPE system to restore the potable water system on the platform with pipes ranging in size from 1/2″ to 3″ in diameter. Pipes are stainless steel and had developed pinhole leaks in just a few years into operation.
ePIPE Project Reaches 10 year Milestone – One California Plaza
Early in the life of this world class facility, the property engineers found evidence of water leak in the copper pipe supply lines servicing the building. In